How We Work

A straight line from estimate to handoff.

No general contractor juggling subs, no framer waiting on someone else's mistake, no new face every time a stage changes. One crew runs your job from the first site walk to final walkthrough — six stages, one accountable scope, one number that doesn't move unless you change something.

6Stages, one crew — the same crew that pours the foundation frames the walls
1Point of contact — one foreman or PM, start to finish, not a rotating cast of subs
$0Change without a written number — nothing moves the price without your sign-off first
60 miService radius from our Van Nuys HQ across the LA basin
The Six Stages

Six stages, no handoffs between them

Every color you see on this page maps to one of these six stages — the same six that show up again in the schedule board below and the gate table further down. One thread, not six separate sections.

01

Plan

We walk the lot, read the soils report and the survey, and price the actual scope rather than a square-foot average. You get an itemised estimate and a stage-by-stage schedule before you sign anything. Structural drawings go to the engineer in this stage, not later.

Gate: signed contract and a stamped, permit-ready plan set

02

Prepare

Permits through LADBS or the relevant city, then the site gets set up properly — protection for what stays, fencing, dust and erosion control, staging and access worked out with the neighbours before trucks arrive. Demo and excavation close this stage out.

Gate: permit issued and posted, site secured

03

Build

The structure goes in: foundation poured to the soils report, frame stood dead-square, steel set where the plan calls for moment frames or columns wood can't carry. This is the stage where the same FRAMO crew doing the framing also does the steel — no scheduling gap between them.

Gate: foundation and framing inspections signed

04

Enclose

Getting the building weather-tight: roof, sheathing, windows and doors, weather-resistive barrier and flashing detailed at every penetration. Rough electrical, plumbing and mechanical go in behind the walls and get inspected while everything is still open.

Gate: rough MEP and insulation inspections passed

05

Finish

Insulation and drywall, then the finishes you actually see and touch — flooring, trim, cabinetry, fixtures, paint — plus the exterior: stucco or siding, hardscape, and anything the plan set calls out. Selections are locked earlier so this stage doesn't stall waiting on a decision.

Gate: all finishes installed, systems commissioned

06

Deliver

Final inspection and sign-off, then we walk the whole job with you and write the punch list down rather than promising to remember it. Everything on that list gets closed before we call it finished. You get the permit card, warranty terms and the documentation in one handover.

Gate: final sign-off, punch list closed, keys handed over

Anatomy Of Your Timeline

What actually happens inside each stage

Eighteen real sub-steps, not a vague bar on a sales sheet. Every one of them has the same crew's name on it — that's the difference between a schedule on paper and one that actually holds.

01 Plan
STEP 01
Site walk & scope
Lot measured, constraints logged, access and staging assessed.
STEP 02
Itemised estimate
Line-item pricing and the schedule, free — not a square-foot guess.
STEP 03
Engineering & plans
Structural drawings stamped and coordinated with the soils report.
02 Prepare
STEP 04
Permits & approvals
Submitted to LADBS or the city; plan-check corrections handled by us.
STEP 05
Site protection
Fencing, dust and erosion control, neighbour notice, staging plan.
STEP 06
Demo & excavation
Cut to depth, over-excavate and re-compact where the report says.
03 Build
STEP 07
Foundation
Rebar and formwork, pre-pour hold point, pour and cure.
STEP 08
Framing
Walls, floors and roof stood square; shear walls and hold-downs set.
STEP 09
Steel & connections
Moment frames, columns and beams — same crew, no sub hand-off.
04 Enclose
STEP 10
Roof & sheathing
Structural sheathing, underlayment and roofing — water off the frame.
STEP 11
Windows & envelope
Openings set, weather barrier and flashing lapped at every penetration.
STEP 12
Rough MEP
Electrical, plumbing and mechanical in the walls, then inspected open.
05 Finish
STEP 13
Insulation & drywall
Title 24 insulation inspected, then board, tape and texture.
STEP 14
Interior finishes
Flooring, trim, cabinetry, fixtures and paint against locked selections.
STEP 15
Exterior finishes
Stucco or siding, hardscape, drainage and site work completed.
06 Deliver
STEP 16
Final inspection
City sign-off on the permit card; certificate of occupancy where required.
STEP 17
Punch list walk
We walk it with you and write every item down. Then we close them.
STEP 18
Handover
Permit card, warranty terms and project documentation, in one package.
Plan
Prepare
Build
Enclose
Finish
Deliver

Illustrative schedule weighting for a mid-size ground-up project — your actual stage-by-stage timeline comes with the estimate, sized to your scope and lot.

Why It Matters

Why "one crew" is the actual point, not a slogan

The Typical Multi-Sub Process

Coordinated by you, accountable to no one

A GC bids the job, then hires separate subs for foundation, framing, MEP, and finishes — each one only accountable for their own piece. When something doesn't line up between two subs' work, there's no single party responsible for the gap. The number quoted at bid time is rarely the number at closeout once change orders from each sub stack up. You're the one relaying information between subs who don't talk to each other directly.

The FRAMO Process

One crew, one accountable scope

One crew carries the job through all six stages, which means the person who poured your foundation is on-site when your framer needs to know exactly where the anchor bolts landed — no drawings-only handoff, no guessing. One scope, one accountable party if something doesn't line up, and one number that only changes if you change something, not because a sub found a reason to add one.

"The stages are the same six on every job. What's different is that one crew runs through all of them instead of five separate ones handing off drawings and hoping nothing got lost in translation."

Realistic Timelines

How long each stage actually takes

Ranges from real Los Angeles projects, not a marketing average. The bar under each row is sized to the range — the longer the bar, the longer that stage can run.

Estimate & contract
Site walk to signed agreement. Fast — this is the part we control entirely.
1–2 wks
Engineering & plan set
Structural drawings, soils report coordination, Title 24 calculations.
3–6 wks
Permitting & plan check Longest wait
City-dependent and outside anyone's control. Hillside and coastal review takes longer. We handle corrections so the clock keeps moving.
4–16 wks
Foundation
Excavation through cure. Caissons on hillside lots add drilling time.
2–5 wks
Framing & steel
The stage that moves fastest when one crew owns both scopes.
4–10 wks
Enclose & rough MEP
Roof, windows, envelope, then trades in the walls and inspected open.
4–8 wks
Finishes
Drywall through paint. Stalls only when selections aren't locked.
6–12 wks
Final & handover
Sign-off, punch list, documentation package and keys.
1–3 wks
Staying Informed

You shouldn't have to call to find out what's happening

Daily

Crew on site

A named lead is on your job every working day. You know who they are and you can talk to them without going through an office.

Weekly

Progress update

Photos of what got done, what's next, and any decision we need from you — sent before you have to ask for it.

Per stage

Gate review

At each of the six gates we confirm the inspection is signed, the schedule still holds, and the next stage is clear to start.

Immediate

Change orders

Anything that moves the price or the date is written up and approved by you before the work happens. No surprises on the final invoice.

The Six Gates

What has to be true before the next stage starts

Each stage ends at a gate, not a guess. Here's what closes each one out.

Gate Plan Prepare Build Enclose Finish Deliver
Steps 01–03 04–06 07–09 10–12 13–15 16–18
Typical span 4–8 wks 4–16 wks 6–15 wks 4–8 wks 6–12 wks 1–3 wks
Inspection Plan check Grading / shoring Pre-pour & framing Rough MEP, insulation Title 24 & systems Final sign-off
You decide Scope and budget Access and staging Structural options Windows, envelope All finish selections Punch list sign-off
We deliver Estimate + schedule Issued permit Structure standing Weather-tight shell Finished spaces Docs, warranty, keys
Gate to pass Stamped plan set Permit posted Framing signed Rough inspections passed Systems commissioned Punch list closed
Technical & Local

Built around how LA permitting and lots actually work

Permitting sets the real clock

LADBS plan check on a standard residential permit typically runs several weeks depending on scope and current department load; deferred submittals add a review cycle on top of that. We build the Prepare stage around this instead of assuming permits will just clear "on schedule."

Special inspection, arranged for you

Where structural steel or certain concrete work requires it, special inspection is scheduled through a licensed inspector and coordinated as part of the Build stage — not left for you to arrange on your own.

Hillside and infill add real steps

Geotechnical review, and sometimes an additional planning entitlement, get added to the Plan stage on the hillside and infill lots common across LA — a flat suburban lot doesn't need either.

Flagged at the estimate, not after

We work out of Van Nuys within roughly a 60-mile radius, and we flag site-specific complications at the estimate stage so the six-stage timeline you're quoted reflects your actual site, not a generic one.

How We Work FAQ

What owners ask before we start

The estimate and contract take one to two weeks, but the real gate is permitting — four to sixteen weeks depending on the city and whether the lot triggers hillside or coastal review. We start engineering and order long-lead items during that window so nothing waits on us once the permit is issued.

The structural scope — foundations, framing, retaining walls and steel — is our own crew. That's the part where hand-offs cause the most damage, so we own all of it under one contract. Specialty trades like electrical, plumbing and mechanical are licensed subs we schedule and supervise directly; you still have one contractor responsible for the outcome and one number to call.

We correct it and re-book. Because the crew is still on site and the work is ours, corrections generally happen within the same week rather than waiting for a trade to come back. A failed inspection on our scope is our cost, not a change order to you.

Anything that moves the price or the schedule is written up, priced and approved by you before the work is done — no verbal approvals, no discovering it on the final invoice. Genuine unknowns do come up on remodels and hillside lots, which is why we flag them at the estimate stage rather than pretending they are not possible.

Often, yes. We start with a site assessment and a review of the existing permit, plan set and inspection history to see what has actually been signed off. If prior work does not match the approved plans it has to be corrected before we can build on top of it — we will tell you that honestly before quoting, because inheriting someone else's unpermitted work is not something we will sign our license to.

Yes — a named crew lead is on your job daily, you get a weekly progress update with photos and any decisions we need from you, and every one of the six stages ends with a gate review confirming inspections are signed and the schedule still holds.

Ready to see how this looks for your project?

Send us the scope, and we'll walk you through exactly which of these six stages apply, what happens in each one, and a real number — not a range that moves later.