Open up a wall. Add a story. Don't guess at what's holding the house up.

FRAMO handles the structural side of remodeling — bearing-wall removal, second-story additions, room additions, and seismic retrofits — engineered, permitted, and shored correctly before anything gets demolished. If your remodel involves a wall that's holding something up, this is the crew that figures out what replaces it.

CA General Building License #1138219 · Bonded $25,000 · Workers'-comp insured

Framed interior of a Los Angeles remodel addition, structural beam and window openings exposed with a city view beyond
Structural remodel, framing exposed · Los Angeles
5 Remodel types — bearing-wall removal through seismic retrofits
6 stages Plan, Prepare, Build, Enclose, Finish, Deliver — same accountable sequence
60 mi Service radius from Van Nuys
Pre-1980 Most LA remodel work touches homes built before today's seismic code
What We Remodel

Five ways a remodel changes what's structural

Which one you're doing decides the engineering, the permit path, and how much of the house has to come apart to get there. Here's what each one actually involves.

01

Bearing-Wall Removal / Open-Concept Conversions

Taking out a load-bearing wall between a kitchen and living room isn't a demo job, it's an engineering problem: an LVL or steel beam sized to the tributary load, carried down to posts, carried down to a footing that can take it. We handle the calc, the shoring, and the install as one sequence.

Best on: opening up a kitchen or living space

02

Second-Story Additions

Adding a full second story means the existing foundation and first-floor framing were never designed to carry it. We evaluate what's there first — foundation capacity, existing shear walls — before anyone signs off on the plan, and add the hold-downs and shear panels the addition actually requires.

Best on: adding bedrooms without expanding the footprint

03

Room Additions / Bump-Outs

Ground-floor additions that extend the footprint, tying new foundation and framing into the existing structure at the seam — the detail that decides whether the addition ages as one building or two.

Best on: expanding square footage on a tight lot

04

Structural Reframing for Conversions

Turning a garage, attic, or basement into livable space usually means reframing the floor or ceiling system, adding real insulation, and — for a bedroom — a code-compliant egress window, not just drywall over what's already there.

Best on: garage, attic, and basement conversions

05

Seismic Retrofits & Soft-Story Strengthening

Bolting cripple walls to the foundation, adding shear panels and hold-downs to older wood-frame homes built before modern lateral code. Most of the pre-1980s housing stock across the Valley falls into this category whether the owner remodels or not.

Best on: older homes with cripple-wall foundations

Progress, Not Promises

Same footprint, load path redesigned

Enclosed framing stage on the left, opened-up structural shell on the right. Drag the handle across to see the stage change.

After — a framed and sheathed structural shell, opened up and ready for the next stage
Before — the original enclosed framing and roof deck, before the structural work opened it up
Before · Enclosed After · Opened up

Real FRAMO jobsite photography — no renders, no stock. This is a placeholder pairing (see the HTML comment at the top of this file) — swap in a real interior bearing-wall-removal before/after once you have one.

Where The Load Actually Goes

Six layers, once the wall is gone

A wall isn't just a wall — it's a load path. Remove it without replacing that path correctly and the failure doesn't show up until years later, as a sagging floor or a cracked ceiling nobody can explain. This is the sequence a removed bearing wall actually gets replaced with.

Governed by CBC/CRC Chapter 23 (wood) and the project engineer's beam and connection schedule. Every connection inspected before it's covered.

Load-path transfer · bottom to top
Temporary shoring
Carries the load during demo, removed only after the permanent beam is inspected
First in, last out
New footing or pad
Sized to the point load the posts will now carry
Per engineer
Posts
Steel or engineered lumber, positioned exactly where the beam's reactions land
Per plan
Engineered beam
LVL, PSL, or steel, sized to span and tributary load — this is what used to be the wall
Per span calc
Connection hardware
Post caps, beam hangers, and hold-downs tying the new members to the framing above and below
Per hardware schedule
Restored ceiling/floor framing
Trimmed and tied back to the new beam so the floor above reads as flat as it did before
Finish-ready
How A Remodel Happens

Six stages on the website, eight when a wall is coming out

Scroll the sequence

01

Existing-Conditions Assessment

We walk the structure before touching anything: which walls are bearing, what the foundation is, what condition the framing is actually in versus what the original plans say.

02

Plan & Engineering

A structural engineer sizes the beam, posts, and any shear panels the new layout needs, and produces the permit set.

03

Permit & Plan Check

LADBS review — bearing-wall removal and second-story additions both require an engineered plan, not a contractor's judgment call.

04

Shoring & Temporary Support

Before any demo, temporary shoring walls or posts go in to carry the load the permanent beam will eventually take over.

05

Selective Demolition

Removing exactly what the engineer's plan calls for, protecting the adjacent structure and finishes that aren't part of the scope.

06

New Structural Install

Engineered beam, posts, and any new shear panels or hold-downs go in and get inspected before they're covered.

07

Rough MEP Adjustment

Electrical, plumbing, or HVAC that used to run through the removed wall gets relocated and inspected inside the open frame.

08

Final Inspection & Finish-Ready Handoff

Structural work signed off, shoring removed, space handed back drywall-ready.

Spec Sheet

Which remodel your project actually is

Side by side, in the terms that decide it. Bring us photos or plans and we'll tell you which column you're in.

Typical ranges for LA residential remodel work. Final design always comes from the project engineer.
Remodel type Bearing-Wall Removal Second-Story Addition Ground-Floor Addition Seismic Retrofit
Typical scope Single wall, one room opened into another New floor added above existing structure New footprint tied into existing walls Existing foundation and cripple walls only
Structural approach Engineered beam + posts replacing the wall New shear walls/hold-downs added to existing frame New foundation section tied to existing Foundation bolting + shear panels added
Foundation impact New point-load footings under posts Existing foundation evaluated for added load New foundation section poured None added — existing foundation reinforced
Permit complexity Engineered plan required Full structural review Full plan check, similar to new construction Often a simplified retrofit permit track
Typical timeline 2-4 weeks structural work 2-4 months for the structural shell 6-10 weeks for the addition's structure 1-3 weeks per house
Best for Opening up a kitchen/living space Adding bedrooms without expanding the footprint Expanding square footage on a tight lot Older homes with cripple-wall foundations
Engineered concrete structural work in progress on a Los Angeles hillside lot, formwork and rebar visible
Structural work, engineered and inspected · Los Angeles
Engineered, Not Guessed

A remodel doesn't get a lighter code.

Same code as new construction

Every structural change is engineered to the same 2022 CBC/CRC Chapter 23 (wood) provisions as new construction — a remodel doesn't get a lighter code just because it's smaller.

Beams sized to actual load, not by eye

Beam sizing (LVL, PSL, or steel) is calculated to actual span and tributary load. Adding a second story means evaluating whether the existing foundation and first-floor shear walls can actually carry it — sometimes they can, sometimes the retrofit has to happen before the addition does.

Existing conditions get evaluated, not assumed

Original plans on an older home often don't match what's actually in the walls. We verify what's really there before the engineer finalizes a design around it.

LA's older housing stock is our normal

A large share of LA's housing stock predates modern seismic code — cripple-wall foundations with little to no bolting, undersized bearing walls, additions bolted onto additions over the decades. We work out of Van Nuys within roughly a 60-mile radius, and existing-conditions surprises are something we plan for rather than get surprised by.

Remodeling FAQ

What owners ask before a wall comes out

Almost any bearing wall can be removed if it's replaced with a properly sized beam and posts carried down to an adequate foundation — the question is never "can this be done," it's "what does it cost to do it right." The rare exception is a wall that's also part of the building's primary shear system, where removing it means adding lateral bracing somewhere else to compensate.

Usually not for a single bearing-wall removal — the shoring and beam install typically takes days, not weeks, and we sequence dust containment around occupied areas. A second-story addition or a full seismic retrofit is a longer, noisier project, and we'll tell you honestly during the estimate whether staying is realistic for your specific scope.

We evaluate the existing foundation and framing against the added load before anyone finalizes a plan — checking footing size, wall construction, and existing lateral bracing against what the addition will add. If the existing foundation can't take it, that becomes part of the scope, not a surprise mid-project.

It's temporary structural support — usually a wall of studs and a header — that carries the load a wall or floor was carrying while we cut it out and install the permanent beam. It's not optional and not padding: without it, the structure above has nothing holding it up during demo. We itemize it separately so you can see it's real work, not a markup.

Four things, in roughly this order: how much of the existing structure has to change (one wall versus a full second story), whether the foundation needs reinforcement to carry new loads, how much has to be temporarily shored and later restored, and how much MEP work gets disrupted by the structural changes. We break these out on the estimate so you can see where the number comes from.

Thinking about opening up a wall?

Send us photos or plans of the space, and we'll tell you honestly whether it's a simple beam swap or something bigger — plus a real number, not a range that moves later.