New Construction · Service 02 / 06

From bare lot to finished structure — one crew, start to finish.

FRAMO manages new construction the way a general contractor should: permit set through frame-out, foundation through final inspection, without handing your project between three companies that don't talk to each other. Single-family homes, ADUs, and multi-story wood-frame buildings up to five stories, built to your engineered plans — or coordinated with ours.

CA General Building License #1138219 · Bonded $25,000 · Workers'-comp insured

A five-story wood-frame building under construction on a Los Angeles street corner, structure framed and scaffolded against a clear sky
5-story wood-frame build, mid-construction · Los Angeles
5 stories Largest Type V wood-frame structure built to date
6 stages Plan, Prepare, Build, Enclose, Finish, Deliver — one crew
60 mi Service radius from Van Nuys
100% Permitted and inspected through LADBS, every build
What We Build

Five ways a project starts from nothing

Which one you need isn't just square footage — it's the permit path, the structural system, and how many stories the lot can carry. Here's what each one actually involves.

01

Single-Family Ground-Up

A full custom home built from a graded pad on an approved architectural and structural set. We run the entire structural scope — foundation coordination, framing, dry-in, and rough-trade sequencing through final frame inspection — as one accountable crew.

Best on: owner-occupied custom homes on an approved lot

02

ADU / Second Unit

Detached and attached accessory dwelling units built to the City of LA's ADU ordinance — the fastest-growing segment of ground-up work on infill lots, usually moving through a simplified plan-check track instead of full structural review.

Best on: rental income or family housing on an existing lot

03

Multi-Story Wood-Frame (Type V)

2- to 5-story wood-frame apartment, condo and mixed-use shells. This is where engineered lateral design matters most — shear-wall schedules, hold-downs and diaphragm nailing patterns get followed to the engineer's plan, not approximated.

Best on: developers and investors building density

04

Light Commercial / Tenant Shell

Ground-up commercial shell-and-core work, structurally complete and ready to hand to a tenant-improvement contractor for the interior build-out — foundation, frame, and dry-in delivered as a clean structural baseline.

Best on: owners and tenants needing a structural shell

05

Spec / Investment Builds

Builder-owned ground-up projects built to a target buyer spec and a fixed calendar, with the schedule transparency an investor needs to plan carry costs against a real construction timeline, not a guess.

Best on: builders and investors working to a resale timeline

Progress, Not Promises

Same lot, six stages later

Structural deck and rebar stage on the left, framed and sheathed roof deck on the right. Drag the handle across to see the stage change.

After — the framed and sheathed roof deck of a wood-frame building, ready for roofing and enclosure
Before — a reinforced deck with rebar mat and conduit tied out ahead of the structural pour
Before · Rebar & deck After · Framed & sheathed

Real FRAMO jobsite photography — no renders, no stock. Confirm final matched before/after pairing for this page before launch (see the HTML comment at the top of this file).

What's Actually Holding It Up

Six layers, every one of them inspected

A wood-frame wall is doing more than holding up a roof — it's the lateral system that keeps the whole building standing in an earthquake. Skip a connection here and the failure doesn't show up until the ground moves. This is the build-up on a typical LA wood-frame wall section.

Governed by CBC/CRC Chapter 23 (wood) and the project engineer's shear-wall and lateral schedule. Every connection inspected before it's covered.

Wood-frame wall section · bottom to top
Sill plate & anchor bolts
Pressure-treated plate bolted to the foundation — ties the frame down
Per engineer
Shear-wall panels
Structural sheathing at the braced-wall lines, nailed to the engineer's schedule
Per shear schedule
Engineered floor system
I-joists or LVL wherever a clear span calls for it, not dimensional lumber
Per span table
Wall framing & hold-downs
Studs at plan spacing, hold-down hardware at every shear-panel end
Per plan
Roof structure
Trusses or rafters, sized to span and load by the truss or roof engineer
Per truss design
Weather-resistive barrier
Building wrap over sheathing, taped and lapped — makes the shell watertight
ASTM E2556
How A Build Happens

Six stages on the website, eight on the jobsite

Scroll the sequence

01

Plan

Permit set review, structural engineering coordination, and plan-check response with LADBS before anyone breaks ground.

02

Prepare

Site prep, temporary power and water, material staging, safety fencing — the unglamorous week that keeps the rest of the schedule from sliding.

03

Foundation Handoff

Foundation poured and cured, verified dead-level and dead-square before the first sill plate goes down. Same crew as the foundation pour, so nothing gets lost in the handoff.

04

Frame (Build)

Walls, engineered floor systems, shear panels, and roof structure go up to the plan, not to habit.

05

Dry-In (Enclose)

Roofing, windows, doors, and weather-resistive barrier. The building is watertight before a single finish trade starts.

06

Rough MEP Coordination

Plumbing, electrical, and HVAC rough-in scheduled and inspected inside the open frame, before drywall covers anything up.

07

Finish

Framing punch-list closed out, structure signed off as drywall-ready.

08

Deliver

Final framing inspection, certificate-of-occupancy support, closeout documentation, and a walkthrough where we point out exactly what was built and why.

Spec Sheet

Which build type your project actually is

Side by side, in the terms that decide it. Bring us your plans and we'll tell you which column you're in.

Typical ranges for LA residential and light-commercial work. Final design always comes from the project engineer.
Build type Single-Family Ground-Up ADU / Second Unit Multi-Story Wood-Frame Light Commercial Shell
Typical stories 1-2 1 (detached) 2-5 1-3
Structural system Conventional wood frame Conventional wood frame Engineered shear-wall / diaphragm system Wood frame or hybrid, per engineer
Foundation pairing Slab or raised — see Foundations Slab-on-grade, typically post-tension Post-tension slab or podium deck Slab or spread footing, per soils report
Permit path Standard LADBS plan check Simplified ADU plan-check track Full plan check + structural review Full plan check + structural review
Typical timeline 4-6 months, foundation to dry-in 2-4 months, foundation to dry-in 6-12+ months depending on stories 3-6 months depending on scope
Best for Owner-occupied custom homes Rental income or family housing on an existing lot Developers and investors building density Owners and tenants needing a structural shell
Framed and sheathed roof deck of a wood-frame building under construction, plywood decking and framing visible against the LA skyline
Roof deck, sheathed and inspected · Los Angeles
Engineered, Not Guessed

The plan set decides. We execute it to code.

Built to the current code cycle

Every structure is engineered to the 2022 California Building Code and Residential Code as adopted by LADBS — not a generic national default, but the version LA's own inspectors are checking plans against.

Lateral design sized for LA's seismic zone

Shear walls or moment frames, depending on the engineer's call, sized for LA's seismic zone rather than approximated. Engineered lumber — LVL, PSL, I-joists — goes in wherever a span calls for it instead of oversized dimensional lumber.

Envelope built to Title 24 before it's covered up

Envelope assemblies are built to meet Title 24 energy compliance before insulation and drywall go on top, so it isn't a problem discovered at final inspection.

LA infill lots are our normal

Setback and height limits, an existing foundation footprint to work around, an ADU sharing utilities with the main house. We work out of Van Nuys and build within roughly a 60-mile radius, and we've run this exact plan-check process with LADBS enough times to know which submittals get flagged.

New Construction FAQ

What owners ask before we break ground

On a FRAMO ground-up job we run the full structural scope — foundation, framing, dry-in — as one accountable crew, and we coordinate directly with your GC or architect on everything else. If you want us as the GC of record for the whole project, we scope that separately; ask when you request your estimate.

Foundation to dry-in usually runs 4-6 months for a single-family home, 2-4 months for an ADU, and 6 months to a year or more for a multi-story wood-frame building, depending on stories and site complexity. We give you a stage-by-stage schedule with the estimate, tied to the 6-stage process above, not one number for the whole project.

Either. Most ground-up clients arrive with an approved architectural and structural set already in hand, and we build to it. If you don't have plans yet, we can point you to the engineers we work with regularly so the structural set is buildable from day one instead of getting redlined at plan check.

Scale and permit path, mostly. An ADU is almost always a single story on a simplified plan-check track under the City's ADU ordinance, so it moves faster and costs less. A full ground-up home or multi-story building goes through standard plan check with full structural review — a longer, more document-heavy process — but it's the same crew and the same 6-stage sequence either way.

Four things, in roughly this order: square footage and number of stories, the structural system your engineer specifies (a 4-story shear-wall building costs more per square foot than a single-story ADU), site access for material delivery and equipment, and how much of the site needs prep before you can even start. We itemize these on the estimate so you can see where the number comes from.

Ready to break ground?

Send us your plans — or tell us what you're picturing — and we'll walk the lot, price the six stages, and give you a schedule you can actually build a timeline around.